Reliability analysis in Maximo,
in plain English

Your Maximo history already holds the answers to most reliability questions. What usually stops people is the time it takes to get them out: exports, spreadsheets and a report request that waits weeks.

Below are the reliability questions maintenance and reliability engineers ask most often, why each one is harder than it looks, and how Interpretos handles it. Each one can be asked in plain English.

1. Which assets keep failing?

Why it matters: A repeat failure is the clearest sign that a fix did not hold. Finding them means counting corrective work orders per asset over a period, and that is rarely a ready-made report.

Our answer: Ask “which assets had three or more corrective work orders in the last twelve months?” Interpretos runs the query against your live Maximo data and shows the working, so you can open the work orders behind every figure.

2. How much of our work is planned?

Why it matters: The balance between preventive and corrective work is one of the most quoted maintenance measures. It is only meaningful when it is counted the same way every month, by site and by asset type.

Our answer: Ask for preventive against corrective work orders or hours, by site, by month. The working is shown with the answer, so the way it was counted is visible and repeatable. Every change of AI model is gated on a test battery before it reaches you.

3. Is our preventive maintenance working?

Why it matters: The real test of a preventive maintenance plan is whether failures went down after it started. That means comparing corrective work before and after, asset by asset.

Our answer: Start with the counts that show where a plan is not holding, for example “which assets had three or more corrective work orders in the last twelve months?”, and compare them with the assets your plans cover. Interpretos shows how confident it is in each answer, and it says so when the data does not support a comparison.

4. Why do failure codes matter so much?

Why it matters: Every one of these questions depends on what was recorded. If failure codes are left empty, or the wrong work type is chosen, the analysis inherits those gaps.

Our answer: Interpretos reports on what is in Maximo, and it says so when it is unsure. If your failure reporting is patchy, the first useful question may be “how many corrective work orders this year have no failure code?”

5. Can we trust the figures in a management report?

Why it matters: A reliability figure is only useful if someone can check it. A number nobody can trace is a number nobody should act on.

Our answer: Every answer shows how it was reached, so a user can check it in Maximo. Every question, and every query made against Maximo, is also logged on your own system for your auditors.

Ask your own reliability questions

We would rather you test us than take our word for it. Try Interpretos on a copy of your own Maximo data and ask it the questions your team asks every week.

IBM and Maximo are trademarks of IBM Corporation. Interpretos is made by Code Development Ltd, the company behind MaxTAF, and is not affiliated with IBM.